There were a number of hurdles to be navigated by the team. Due to the extension being above public drains and next to a protected tree there were significant underground bridging piles to be built. This was also a challenge due to the abundant volcanic rock located just underneath the top soil which required a redesign of the foundations by us and the engineers.
As we do not believe in cutting corners significant time and effort was taken to ensure the project design was altered in the most cost effective way, and ensured that the home could be completed as designed